Project P374-2021 Sports Facilities for UAE Muay Thai Kick Boxing Faderation
Scope of Work

HVAC
Supply and Installation of FAHU’s, AHU’s, FCU’s, Split Units, Primary Chilled Water Pumps, Pressurization Pumps, Automatic Dosing System, Chemical Dosing Pump, Ventilation Fans & Smoke Fans, Chilled Water Pipes, Valves, Air Diffuser & Duct and all other related works to complete the HVAC systems,

Plumbing
Supply & Installation of Sanitary wares, Pumps, GRP Water Tank, Electric Water Heater, water Meters, Multimedia Filter, UV Sterilization, Copper Silver Ionization System, PPR Pipe, & Valves, DRAINAGE – Supply and Installation of Submersible Pump, Floor Drain Cover FCU, Rain Water outlet, Channel Grating, Floor Grating, manhole Cover, Gully Trap Covers, Sound Trap, PRMH, Grease Interceptor, oil Interceptor, medical trap, UPVC & HDPE Pipes.

Electrical
Supply & Installation of (MDB’s SMDB’s DB’s, MCC panels, ATS panels, Energy meters) Generator Set LV Cables (cable tray & Trunking, UPVC Duct & accessories, manhole Covers, Busbar System (Wiring Accessories – Switches & Sockets, isolators, Earthing & Lighting Protection, Power Point (Conduct/Piping & wiring) Light Point Conduits/Piping & Wiring.