  • Demolition, Construction & Maintenance of the Building SUNSET SQUARE for H.E Ahmed Khalifa al Sowaidi
Back

Demolition, Construction & Maintenance of the Building SUNSET SQUARE for H.E Ahmed Khalifa al Sowaidi

Scope of Work

HVAC

Supply and Installation of Chillers, FAHU’s, AHU’s, FCU’s, Chilled water pumps, Fans, DX Units, PICVs Ducting, insulation, equipment, pipes, valves, fittings and accessories, chillers Plant Manger and all equipment including control devices and accessories

Plumbing

Supply & Installation of Water supply system/ Hot water System, including Pumps, Pipes, fittings, valves, filtration set, water heaters, etc. in line with contract documents, GRP water tanks with fittings and accessories. Water meters, main water meters, service meters along with full accessories.

Electrical

Supply and installation of transformer, LV switcher {MDBs, SMDBs, FDBs, MCC Panels ATS Panels} , Isolators, Generators, LV cables & Wires, Cables Trays Trunking Busbar System, Wiring Accessories, Light Point (Wiring + Piping) Power point (Wiring + Piping), Supply & Installation of Light Fixtures, Isolators, Glands and Lugs.

Fire Fighting

Supply & Installation Fire Protection System, Pumps, Pipes, Valves, Fittings & Accessories, Automatic Sprinkler System, Foam Sprinkler System, Clean Agent System, Water Spray System, Pre-Action System, Fiore Extinguishers, Fire Fighting System for LPG tank.

GAS System

Supply and Installation of LPG Gas System

  • Nature ofJob

    Complete MEP Works

  • Consultant

    M/s RW Armstrong & Associates

  • Main Contractor

    M/s Target Engineering Construction Co. LLC

  • Project Budget

    AED 28,800,000.00