  • Project P374-2021 Sports Facilities for UAE Muay Thai Kick Boxing Faderation
Back

Project P374-2021 Sports Facilities for UAE Muay Thai Kick Boxing Faderation

Scope of Work

HVAC

Supply and Installation of FAHU’s, AHU’s, FCU’s, Split Units, Primary Chilled Water Pumps, Pressurization Pumps, Automatic Dosing System, Chemical Dosing Pump, Ventilation Fans & Smoke Fans, Chilled Water Pipes, Valves, Air Diffuser & Duct and all other related works to complete the HVAC systems,

Plumbing

Supply & Installation of Sanitary wares, Pumps, GRP Water Tank, Electric Water Heater, water Meters, Multimedia Filter, UV Sterilization, Copper Silver Ionization System, PPR Pipe, & Valves, DRAINAGE – Supply and Installation of Submersible Pump, Floor Drain Cover FCU, Rain Water outlet, Channel Grating, Floor Grating, manhole Cover, Gully Trap Covers, Sound Trap, PRMH, Grease Interceptor, oil Interceptor, medical trap, UPVC & HDPE Pipes.

Electrical

Supply & Installation of (MDB’s SMDB’s DB’s, MCC panels, ATS panels, Energy meters) Generator Set LV Cables (cable tray & Trunking, UPVC Duct & accessories, manhole Covers, Busbar System (Wiring Accessories – Switches & Sockets, isolators, Earthing & Lighting Protection, Power Point (Conduct/Piping & wiring) Light Point Conduits/Piping & Wiring

Fire Fighting

Supply & Installation of Fire pump Set, 4 Way Breeching Unit, Fire Hose Cabinet, Fire Extinguisher, Fire Blanket, Fire Suppression System, Seamless Pipes & Valves.

Low Current System

Supply and Installation of Fire alarm System & CBS, Public Address System, Telephone/Structured Cabling System, CCTV System, ACS, Intercom System, Parking/Management System, Lighting Control System, Gate barrier.

  • Nature ofJob

    Complete MEP Works & Fire Fighting

  • Consultant

    M/s Hannover Consulting Engineers LLC

  • Main Contractor

    M/s Al Diyar General Contracting Company LLC

  • Project Budget

    AED 22,000,000